Downtime Analysis of the XCMG GR3005T Pro Motor Grader Engine Using RCM II and FMEA
Read record, response & limits
Six-unit maintenance/reliability study
The study analyses maintenance and breakdown records for six GR3005T Pro graders at one Indonesian worksite, covering February 2023–November 2024. It identifies critical engine components and recommends condition inspections and planned replacement to reduce downtime.
Outcome and response
Original paper and journal record reviewed
No global failure-rate or factory-defect inference. The journal page says 2026-02-02, while the PDF front matter says 09,02,2026. Abstract/conclusion say 63 modes, but one results paragraph says 61; this summary omits that inconsistent count.
Original PDF abstract, methods, results and conclusions; journal publication record
PDF pages 1–5; DOI 10.22146/jtrab.v3i01.22225; landing-page Published field
Additional representation or related link supplied in this review. The model evidence conclusion relies on the primary source and its stated review scope; no separate full-body review is claimed for this link.